Green Stone Wellness Centre
Sukabumi green throughout the wet zones — hammam, plunge pools and wet lounges — with natural pebble mosaic on the water-feature walls where moving water needed a surface to break against.
Project detail
Thermal cycling was the technical constraint. Hammam surfaces move between ambient and steam temperature several times a day, which is demanding on any adhered stone. Fixing system and joint width were specified with that in mind rather than to the standard wet-area detail.
The plunge pools use the same honed green stone as the wall cladding, so the water and the walls read as one continuous material rather than a pool set into a room.
Natural rounded pebble — not sliced — was used on the water-feature walls specifically because the rounded profile breaks falling water into visible movement. Sliced pebble would have let it sheet.
Project Data
| Project name | Green Stone Wellness Centre |
|---|---|
| Location | Muscat, Oman |
| Year | 2024 |
| Client | Wellness resort |
| Stone | Sukabumi Green Stone & River Pebble |
| Finish | Honed walls, bush hammered floors, natural pebble features |
| Size | 300 × 600 mm cladding, 300 × 300 mm mosaic |
| Application | Hammam, plunge pools, wet lounges, water features |
| Quantity supplied | 540 m² green stone, 120 m² pebble mosaic |
Green Stone Wellness Centre — images
Related projects
A similar project?
Send the drawings and we will return a take-off, a material recommendation and an FOB, CFR or CIF quotation.